SHIN YANG Group Proactively Takes on Social Responsibility to Repair Luodong Coastal Breakwater
Published atFeb 28, 2025 05:36 pm
(Miri, 28th) The repair work on the Luodong coastline is fully underway! To resist the invasion of sea waves and prevent coastal roads from being eroded, the construction team is hastily building a 200-meter long breakwater to enhance coastal protection and ensure local ecological and traffic safety.
This project is undertaken by SHIN YANG Group as part of their Corporate Social Responsibility (CSR). The Vice Chairman, Datuk Ling Lu Kiong , personally mobilized heavy machinery from Bintulu Province, actively engaging in the operation. Large rocks transported from the interior of Banan are being used to build a sturdy protective dam, effectively mitigating the impact and destruction of massive waves on the coast.Trucks transport large stones to the coast, where heavy machinery precisely stacks them, building a solid protective wall.The project has entered its fifth day, with trucks transporting large stones to the coast. On-site, heavy machinery is responsible for precise stacking, creating a towering "stone wall" on the beach, providing a strong barrier for the Luodong coast. Currently, one piece of heavy machinery is operating, but another has been paused due to a malfunction. The engineering team is speeding up repairs to ensure that the project schedule is not affected.
It is reported that if the project progresses smoothly, it is expected to be completed within a week. The Luodong coast has long suffered from erosion by sea waves, causing the coastline to continue to shrink and posing a serious risk of damage to the coastal road. Local residents have been hoping for governmental action for many years but have seen no tangible measures until now.
Now, SHIN YANG Group is proactively taking on social responsibility to promote the construction, fulfilling this urgent need for the local community. This move not only showcases the spirit of the enterprise giving back to society but also receives high praise from the local residents.
The construction team is hastily building the Luodong coastal breakwater.The ground originally eroded by massive waves, with soil loss, has been replenished.Blocking the stormy waves from swallowing the Luodong coastal road, SHIN YANG Group proactively undertakes social responsibility, building a sturdy long dam with huge stones.Heavy machinery carries and stacks large stones, providing a strong barrier for the Luodong coast.
This article has been translated using our AI technology. While we strive for accuracy,
AI translations
may contain errors. For the most precise information, please refer to the original article.